A mobile EUDR supplier portal: capturing plots without friction
Why a mobile supplier portal solves the EUDR bottleneck: the farmer captures their plot with a link, installs nothing and registers for nothing, and the platform validates the geometry.
Practical guides for coffee importers and roasters in Spain and Portugal: geolocation, satellite screening, the DDS dossier and TRACES.
Why a mobile supplier portal solves the EUDR bottleneck: the farmer captures their plot with a link, installs nothing and registers for nothing, and the platform validates the geometry.
How to run the EUDR risk assessment for coffee: country risk, chain complexity, mixed lots and documentary gaps, and which mitigation measures to apply before TRACES.
When the EUDR requires a polygon and when a point is enough, what coordinate precision you need, and how to capture the farm geometry correctly on a mobile phone.
Reg. EU 2025/2650 delays the EUDR: 30 Dec 2026 for large and medium enterprises and 30 Jun 2027 for micro and small. What to do now so you are not late for TRACES.
Everything a coffee importer or roaster in Spain and Portugal needs to comply with the EU Deforestation Regulation (EU) 2023/1115: geolocation, satellite screening, the DDS dossier and TRACES submission.